4210 LABELLE ST

Projects Our efforts included replacing drywalls, overhauling the flooring and baseboards, and painting the walls, doors, and trim. We also installed new FRP panels in areas requiring increased durability, as well as new kitchen cabinets in all the office areas. Additionally, We removed and reinstated a damaged 25-foot steel beam and replaced a temporary roof […]

STANTEC OFFICE OTTAWA

Projects The project was executed during the pandemic, presenting unique challenges but our team overcame by taking advantages of empty offices to successfully complete the office fit-up. We redesigned the whole Stantec’s Ottawa office by reconfiguring the walls, floors, and ceilings; upgrading the security system and installing high-grade finishes; conducting concrete polishing and constructing a […]

THE TEN SPOT

Projects This project consisted of extensive demolition and construction of an open ceiling design, custom millwork, specialty furniture within waxing rooms, and polished concrete floors throughout.This fresh, hip beauty bar is the perfect place to pamper yourself and #FeelLikeATen! Learn all about their ‘anti-spa’ philosophy, visit https://www.thetenspot.com/glebe/

99 BANK STREET

Projects This 22 week interior tenant fit-up within this Class “A” office tower at 99 Bank Street, was a two-phase project with 25,503 square feet to be demolished back to base building followed by construction of a complete new office set up. Phase 1 saw a sound rated demising wall built to separate the construction […]

2341 PERKING DRIVE, NORTH GOWER

Projects The Bassi Environmental Services + Disaster Recovery division was hired to complete the removal of all asbestos containing materials throughout the post office (wall, ceiling, and floor finishes).  

3012 ST. JOSEPH BOULEVARD, DENTAL DOCS NEW BUILD

Projects Located on St. Joseph Boulevard in Orleans, the Orleans Dental Clinic is a state of the art facility servicing the local community. The property is 15,500 square feet and was purpose built specific to all the required medical health standard necessary for a dental clinic.  

111 ALBERT STREET, OTTAWA, ON

Projects Bassi is acting as Construction Manager for this tenant fit up project within a converted theatre space at the World Exchange Plaza. The renovation includes open plan, creative concepts, nooks & neighborhoods suitable to everyday work. Our team focus is to help create a “wow” experience for Klipfolio employees & future visitors.  

1430 BLAIR ROAD, OTTAWA, ON

Projects Bassi Construction was hired to complete the base building demolition project in co-ordination with working along side with In-Tempo Design. Our team followed strict guidelines to keep scrap metal in order for it to be used by local artist. Upon demolition completion, their work was displayed for public to view.  

1818 WOODWARD DRIVE

Projects An addition which included Interior fit up and recladding of front façade. Bassi completed interior demolition and new fit up for the sales center office which also included reconfiguration of the loading dock location.  

350 SPARKS STREET, OTTAWA, ON

Projects This project consisted of the demolition of the 9,000 sq.ft. Atrium. The scope of work included the demolition of all floor, wall and ceiling finishes. The work was completed with high pedestrian volumes accessing the office and hotel tower.