2200 HALIFAX DR

Projects The Bassi Restoration Division was hired to complete the concrete repairs on multiple balconies. Access to the balconies was done by swing stage in order to complete the localized concrete repairs.  

2231-2247 WALKLEY ROAD

Projects Project included concrete repairs, application of a waterproofing membrane, and installation of new guard rails at 50 balconies. Localized concrete repairs at the three-building complex. Phased work over multiple years beginning in 2015.  

230 BRITTANY AVENUE, PARKING GARAGE REPAIRS

Projects Parking garage repairs including deck waterproofing, new expansions joints, asphalt paving, concrete pavement, drain replacements and break through repairs as well as walls and columns.  

350 SPARKS STREET, OTTAWA, ON

Projects This project consisted of the demolition of the 9,000 sq.ft. Atrium. The scope of work included the demolition of all floor, wall and ceiling finishes. The work was completed with high pedestrian volumes accessing the office and hotel tower.  

37 ENTERPRISE AVENUE- NEW ADDITION

Projects The job consisted of the construction of a new 14,000 square foot addition to the existing Frito Lay warehouse and a new parking lot.  

373 LAURIER AVENUE EAST

Projects Bassi Construction was hired as the general contractor to complete the building envelope project at 373 Laurier Ave East. The scope of work consisted mainly of EIFS repairs, window caulking and composite waterproofing applications.  

665 BATHGATE DRIVE, COMPLETE EXTERIOR RETROFIT

Projects This project consists of full removal and replacement of the exterior masonry wall and heating system at a 20-storey condominium. The project is phased over four years, and work is being completed while the condo units remain occupied. The new wall system includes an insulated steel stud wall, new windows, and new shelf angles […]

CANFIRST CAPITAL MANAGEMENT, 36-38 ANTARES DRIVE, OTTAWA, ON

Projects Bassi was hired to demo the interior space as well as restore the exterior façade. The scope of work included the demolition of the pre-existing tenant fit up in order to open the space up for the landlords leasing efforts. Upon completion of the first phase of work, Bassi was hired to install a new elevator & complete new washroom retrofits throughout the […]

RIDEAU CARLETON RACEWAY

Projects Bassi Construction was hired as the General Contractor to perform a stadium deck membrane replacement at the Rideau Carleton Raceway in 2015.