Projects Our efforts included replacing drywalls, overhauling the flooring and baseboards, and painting the walls, doors, and trim. We also installed new FRP panels in areas requiring increased durability, as well as new kitchen cabinets in all the office areas. Additionally, We removed and reinstated a damaged 25-foot steel beam and replaced a temporary roof […]

404 ELGIN STREET

Projects Rising from the Ashes: our ongoing efforts to restore 404 Elgin Street. Despite the challenges, our team at Bassi has been working since June 2022 to restore this multi-unit apartment building after a devastating fire caused by a faulty extension cord. The team has made significant progress, including full building clean-up, water damage mitigation, […]

OLD OTTAWA EAST RESIDENTIAL PROPERTY – TARION DEFICIENCY REPAIRS

Projects Bassi was contracted by the homeowners for Tarion deficiency repairs to this new four-level home in Old Ottawa East due to mold and builder deficiencies.  Work began in January 2021 and was substantially completed by early May 2021. Scope of work included removal and reinstatement of all basement interior finishes and partition walls; installation […]

2341 PERKING DRIVE, NORTH GOWER

Projects The Bassi Environmental Services + Disaster Recovery division was hired to complete the removal of all asbestos containing materials throughout the post office (wall, ceiling, and floor finishes).  

1281 PARKHILL CIRCLE

Projects Fire restoration of 2 story home with rental unit. Major structural repairs to roof, framing, and all interior finishes are to be re-mediated and replaced.  

1541 VINCENT MASSEY DRIVE

Projects Bassi was hired to act at the general contractor for the OHA. The project included the restoration & rebuild of the 27,000 sq.ft student residence which burnt down. During the remediation process, we were hired to add an addition 4,500 sq.ft. building between the existing structure and the new residence.  

2612 SHEFFIELD ROAD

Projects Bassi was hired to restore the 16,000 Sq.Ft. unit due to a fire. Beyond restoration, our team added a new second storey mezzanine, new office space and reinstated the warehouse space.  

3326 LIMEBANK ROAD

Projects Fire restoration of Bay #2 at 3326 Limebank.  Fire started on mezzanine level causing smoke and floor damage throughout unit. Including damages to roof, trusses, and windows.  

285 LORETTA AVENUE

Projects The Bassi Fire & Flood division was hired for the fire restoration of a 2 bedroom apartment including asbestos abatement of drywall finishes.  

420 CITÉ-DES-JEUNES BLVD

Projects Bassi was hired to re-build the 3-storey wood frame residential building which was subject to a fire. The building is part of a large 32-unit complex consisting of apartment and condo buildings.