CARLETON UNIVERSITY, THE FUTURE LEARNING LAB.

Projects Together with BPA Advanced Solutions and Rossmann Architecture Inc, the project came along nicely in just 6 months to add many new study spaces designed to foster innovation and incentivize student-centered ways of teaching. This project consisted of selective demolition and construction of 3 new Universal washrooms for accessibility, new electrical power plan and […]

713 MONTREAL ROAD, MONTFORT HOSPITAL

Projects Bassi Construction was hired as the General Contractor to complete a restoration project at The Montfort Hospital. the scope of work performed was loose paint removal which was conducted and completed on schedule. In addition, parking garage, speed bump and podium waterproofing repairs have been conducted at the hospital.  

2341 PERKING DRIVE, NORTH GOWER

Projects The Bassi Environmental Services + Disaster Recovery division was hired to complete the removal of all asbestos containing materials throughout the post office (wall, ceiling, and floor finishes).  

1541 VINCENT MASSEY DRIVE

Projects Bassi was hired to act at the general contractor for the OHA. The project included the restoration & rebuild of the 27,000 sq.ft student residence which burnt down. During the remediation process, we were hired to add an addition 4,500 sq.ft. building between the existing structure and the new residence.  

RIDEAU CARLETON RACEWAY

Projects Bassi Construction was hired as the General Contractor to perform a stadium deck membrane replacement at the Rideau Carleton Raceway in 2015.