1600 JAMES NAISMITH

1600 James Naismith

Projects Phase one involves an extensive demolition, removing remnants of the call center era, including a commercial kitchen, cafeteria, and even a Tim Hortons. But that’s just the beginning. We’re embarking on creating breathtaking living spaces with 219 thoughtfully designed apartment units, luxurious amenities, a state-of-the-art gym, dedicated parking spots, and secure bike storage for […]

4210 LABELLE ST

Projects Our efforts included replacing drywalls, overhauling the flooring and baseboards, and painting the walls, doors, and trim. We also installed new FRP panels in areas requiring increased durability, as well as new kitchen cabinets in all the office areas. Additionally, We removed and reinstated a damaged 25-foot steel beam and replaced a temporary roof […]

404 ELGIN STREET

Projects Rising from the Ashes: our ongoing efforts to restore 404 Elgin Street. Despite the challenges, our team at Bassi has been working since June 2022 to restore this multi-unit apartment building after a devastating fire caused by a faulty extension cord. The team has made significant progress, including full building clean-up, water damage mitigation, […]

STANTEC OFFICE OTTAWA

Projects The project was executed during the pandemic, presenting unique challenges but our team overcame by taking advantages of empty offices to successfully complete the office fit-up. We redesigned the whole Stantec’s Ottawa office by reconfiguring the walls, floors, and ceilings; upgrading the security system and installing high-grade finishes; conducting concrete polishing and constructing a […]

CARLETON UNIVERSITY, THE FUTURE LEARNING LAB.

Projects Together with BPA Advanced Solutions and Rossmann Architecture Inc, the project came along nicely in just 6 months to add many new study spaces designed to foster innovation and incentivize student-centered ways of teaching. This project consisted of selective demolition and construction of 3 new Universal washrooms for accessibility, new electrical power plan and […]

AVALON PARK

Projects Bassi Construction LP’s Restoration Division was contracted in the spring of 2021 to perform a building envelope rehabilitation to a 3-tower apartment complex (Avalon Park) located in Ottawa’s south east end. Currently we have 22 active swing stages on site, with 40+ workers performing masonry and concrete repairs, balcony membrane installation and guardrail replacement, as […]

OLD OTTAWA EAST RESIDENTIAL PROPERTY – TARION DEFICIENCY REPAIRS

Projects Bassi was contracted by the homeowners for Tarion deficiency repairs to this new four-level home in Old Ottawa East due to mold and builder deficiencies.  Work began in January 2021 and was substantially completed by early May 2021. Scope of work included removal and reinstatement of all basement interior finishes and partition walls; installation […]

713 MONTREAL ROAD, MONTFORT HOSPITAL

Projects Bassi Construction was hired as the General Contractor to complete a restoration project at The Montfort Hospital. the scope of work performed was loose paint removal which was conducted and completed on schedule. In addition, parking garage, speed bump and podium waterproofing repairs have been conducted at the hospital.  

2341 PERKING DRIVE, NORTH GOWER

Projects The Bassi Environmental Services + Disaster Recovery division was hired to complete the removal of all asbestos containing materials throughout the post office (wall, ceiling, and floor finishes).  

2860 CEDARWOOD DRIVE – INTERIOR RECREATION CENTRE RENOVATION

Projects Modernization to a dated recreation center serving the Herongate community. The project scope included extensive architectural finishes upgrades inclusive of new windows, roof and upgraded exterior façade. The mechanical scope included a new state of the art de-humidifier as well as new modern plumbing fixtures. The building is eliminated with new LED low energy […]